BuildingServicePerformance Team: CWE System Walk-Through Session - Fri 2008-06-06 (1IPF)
BuildingServicePerformance team conference call, Fri 2008.06.06, ~2.0 Hr. call starting 2:00pm EDT / 11:00am PDT / 18:00 UTC (1IPG)
Conference Call Details: (1IPH)
- Date: Friday, May 23, 2008 (1IPI)
- Start Time: 2:00pm EDT / 11:00am PDT / 18:00 UTC (1IPJ)
- ref: World Clock (1IPK)
- Expected Call Duration: 1.5~2.0 hours (1IPL)
- Dial-in Number: (1IPM)
- Direct call from from Skype: +990008275823120 (1IPN)
- When calling in from a phone, use Conference ID: "5823120#" (1IPO)
- from a US telephone (US): +1-605-475-8590 (South Dakota, USA) (1IPP)
- from Europe, call: (1IPQ)
- callers from other countries please dial into either one of the US or European numbers (1IQ1)
- Shared-screen support (VNC session) will be started 5 minutes before the call at: http://vnc2.cim3.net:5800/ (1IQ2)
- view-only password: "ontolog" (1IQ3)
- if you plan to be logging into this shared-screen option (which the speaker may be navigating), and you are not familiar with the process, please try to call in 5 minutes before the start of the session so that we can work out the connection logistics. Help on this will generally not be available once the presentation starts. (1IQ4)
- Please review our Virtual Session Tips and Ground Rules - see: VirtualSpeakerSessionTips (1IQ5)
- RSVP to peter.yim@cim3.com appreciated. (1IQ6)
- This session, like all other Ontolog events, is open to the public. Information relating to this session is shared on this wiki page: http://ontolog.cim3.net/cgi-bin/wiki.pl?TutorialSession_2006_11_16 (1IQ7)
- Please note that this session may be recorded, and if so, the audio archive is expected to be made available as open content, along with the proceedings of the call to our community membership and the public at-large under our prevailing open IPR policy. (1IQ8)
Attendees (1IQ9)
- Attended: (1IQA)
- Expecting: (1IQB)
- (1IQG)
- ... if you are coming to the meeting, please add your name above (plus your affiliation, if you aren't already a member of the community) above, or e-mail <peter.yim@cim3.com> so that we can reserve enough resources to support everyone's participation. ... (1IQH)
- Regrets: (1IQI)
Agenda Ideas (1IQJ)
- Peter: system walk-through/tutorial (over an augmented conference call) on the use and administration of the CWE-workspace (1IQK)
- Deborah - want to cover: (1IQL)
- Ravi - access from secured location; (1IWK)
Abstract (by PeterYim) (1IQP)
The Ontolog community of practice transacts predominantly over its virtual collaborative work environment ("cwe") which is hosted on the CIM3.NET infrastructure. This work environment serves as a dynamic knowledge repository for the community, and has, over the years, accumulated a rich body of very relevant knowledge that is openly accessible by the community and the world at large. (1IQQ)
This tutorial is a hands-on session that will be useful for both new-comers as well as experienced users of the Ontolog-cwe. We will be spending time on (a) the philosophy behind the cwe design, (b) navigating and accessing the Ontolog body of knowledge, (c) showing everyone how to effectively participate and contribute as members of the community, (d) explaining some of the more advanced features of this collaborative work environment, and (e) cover some of the administration aspects of the CWE workspaces. (1IQR)
Ref: http://community.cim3.net/cgi-bin/wiki.pl?CweSystemWalkThrough#nidAIW (1IQS)
See also: http://community.cim3.net/cgi-bin/wiki.pl?CweUser & http://community.cim3.net/cgi-bin/wiki.pl?CweAdmin (1IQT)
Agenda & Proceedings (1IQU)
1. Opening and Welcome - PeterYim (1IQV)
2. Self-introduction - all participants (1IQW)
- also - Question: what does everyone want to get out of this session? (1IQX)
- Peter - try help every become more effective (1IWB)
- Bob - uploading files that are open and community-only (1IWC)
- Michelle - separating material with different IPR; use of html; creating template (1IWD)
- Rex - webdav connection; (1IWE)
- Deborah - posting images; posting different file types; handling the sharing excel spreadsheets; PurpleNumbers; (1IWF)
3. What do we want done today? (1IQY)
- provide some working details on the mechanics of collaborating at Ontolog, through the use of the "collaborative work environment (CWE)" that is hosted on the CIM3.NET infrastructure. (1IQZ)
- help get the BuildingServicePerformance project community get proficient with the CWE collaboration tool suite available to them. (1IR0)
- exchange among members of this community on how to navigate and access the (future) BuildingServicePerformance and broader Ontolog body of knowledge, and, more importantly, how to effectively participate and contribute as members of the community. (1IR1)
- we welcome the participation of members from collegial communities at this session too! (1IR2)
- cover some of the administration aspects of the CWE workspaces (1IWM)
- Question: what else do we want to achieve today? (1IR3)
4. Introducing the 4 workspaces in the CWE - see: http://ontolog.cim3.net (1IR4)
5. Tutorial for the CWE user - see: http://community.cim3.net/cgi-bin/wiki.pl?CweSystemWalkThrough#nidAIW (1IR5)
6. Participant requested topics to be covered: (1IR7)
- How to post images, what size should they be? (1IR8)
- Can you interact with and share a table ala Google documents? (1IR9)
- What happens if you paste a purple number in a different place EX: front page to charter page? (1IRA)
- IPR issues - what goes where (1IW8)
- when and how to use html with the cwe (1IW9)
- creating template (1IWG)
- posting different file types (1IWH)
- handling the sharing excel spreadsheets (1IWI)
- access from secured location (1IWL)
7. Some advanced features of the CWE - http://community.cim3.net/cgi-bin/wiki.pl?CweSystemWalkThrough#nidALQ (1IRB)
8. Tutorial for the CWE administrator - see: http://community.cim3.net/cgi-bin/wiki.pl?CweSystemWalkThrough#nidAL1 (1IRC)
9. Q & A / Discussion (1IRE)
- Participant input and notes: (1IRF)
- Deborah's demo image: (1IWQ)