OntologySummit2007: Frameworks For Consideration (T1X)
Maturity Model (T1U)
First suggested by: SteveRay (in his Ontology Summit 2007 Launch Meeting presentation - ref: ConferenceCall_2007_01_18 (T1V)
This thinking is along the lines of the Carnegie Mellon - Software Engineering Institute (SEI) Capability Maturity Model for Software (CMM) - ref: http://www.sei.cmu.edu/cmm/ (T1W)