Difference (from prior revision)
Changed: 3,5c3,5
|
* Purpose: Preparation for OntologySummit2009 presentation/discussion {nid 1W62} * Working Short name: Ontology across Building, Emergency, and Energy Standards {nid 1W63} * Working Long name: Ontology and tools for integration of building, emergency management, and energy management standards for cross-domain information exchange and representation. {nid 1W64} |
|
* Purpose: Preparation for OntologySummit2009 presentation/discussion {nid 1W62} * Working Short name: Ontology across Building, Emergency, and Energy Standards {nid 1W63} * Working Long name: Ontology and tools for integration of building, emergency management, and energy management standards for cross-domain information exchange and representation. {nid 1W64} |
Changed: 7c7
|
=== Details: {nid 1W65} === |
|
=== Details: {nid 1W65} === |
Changed: 9c9
|
* Date: '''Saturday, April 04, 2009 ''' {nid 1W66} |
|
* Date: '''Saturday, April 04, 2009 ''' {nid 1W66} |
Changed: 11,15c11,15
|
* Start Time: 10:00 AM Pacific / 1:00 PM Eastern {nid 1W67} * Expected Call Duration: 1.5 hour {nid 1W68} * Dial-in Number:(712) 432-0800 {nid 1W69} * Participant Access Code: 925775# {nid 1W6A} * When prompted enter the access code that has been assigned, followed by the # key. Once connected to the conference, you will be able to talk and have access to the touch tone commands listed below. {nid 1W6B} |
|
* Start Time: 10:00 AM Pacific / 1:00 PM Eastern {nid 1W67} * Expected Call Duration: 1.5 hour {nid 1W68} * Dial-in Number:(712) 432-0800 {nid 1W69} * Participant Access Code: 925775# {nid 1W6A} * When prompted enter the access code that has been assigned, followed by the # key. Once connected to the conference, you will be able to talk and have access to the touch tone commands listed below. {nid 1W6B} |
Changed: 17,19c17,19
|
# 3 Exit - exit the call {nid 1W6C} # 4 Instructions - conference instructions {nid 1W6D} # 6 Mute/Unmute - caller controlled muting {nid 1W6E} |
|
# 3 Exit - exit the call {nid 1W6C} # 4 Instructions - conference instructions {nid 1W6D} # 6 Mute / Unmute - caller controlled muting {nid 1W6E} |
Changed: 21c21
|
== Suggested Agenda {nid 1W6F} == |
|
== Suggested Agenda {nid 1W6F} == |
Changed: 23,33c23,33
|
* Ontology and tools for integration of building, emergency management, and energy management standards for cross-domain information exchange and representation. {nid 1W6G} * EDXL-RIM and ValueListURN {nid 1W6H} * Pragmatics of the building industry, differences between BIPM and BIM {nid 1W6I} * Medical & Public Health Information Sharing {nid 1W6J} * From Steve Ray {nid 1W6K} ** Geometry standards didn’t begin with STEP as your spiral implies. Some in the room with doubtless raise that. {nid 1W6L} *** The slides are only to tell a story, beginning at STEP because of the influence on BIM, the beginning of geometry standards could go back as far as Pythagoras. {nid 1W6M} ** As you progress through the spiral, you mix geometry standards with languages, organizations, and various other internet events. It’s not clear how you picked the things you did. {nid 1W6N} *** For a system like the Open Floor Plan Displays and Data Exchange to work, a number of languages and organizations need to work together as a web service over the internet. There are certain to be items missing which should be corrected. {nid 1W6O} ** I assume Michelle will cover this, but it’s not clear by the end of your slides just what the project is that you are presenting. I recognize you mention the Open Floor Plan Display Project, but the last slide is the first time I saw it mentioned. I know you are working on the historical context, but you might want to go a little lighter on that for this meeting, and spend a little more on the project. {nid 1W6P} *** Will modify based on call today {nid 1W6Q} |
|
* Ontology and tools for integration of building, emergency management, and energy management standards for cross-domain information exchange and representation. {nid 1W6G} * EDXL-RIM and ValueListURN {nid 1W6H} * Pragmatics of the building industry, differences between BIPM and BIM {nid 1W6I} * Medical & Public Health Information Sharing {nid 1W6J} * From Steve Ray {nid 1W6K} ** Geometry standards didn’t begin with STEP as your spiral implies. Some in the room with doubtless raise that. {nid 1W6L} *** The slides are only to tell a story, beginning at STEP because of the influence on BIM, the beginning of geometry standards could go back as far as Pythagoras. {nid 1W6M} ** As you progress through the spiral, you mix geometry standards with languages, organizations, and various other internet events. It’s not clear how you picked the things you did. {nid 1W6N} *** For a system like the Open Floor Plan Displays and Data Exchange to work, a number of languages and organizations need to work together as a web service over the internet. There are certain to be items missing which should be corrected. {nid 1W6O} ** I assume Michelle will cover this, but it’s not clear by the end of your slides just what the project is that you are presenting. I recognize you mention the Open Floor Plan Display Project, but the last slide is the first time I saw it mentioned. I know you are working on the historical context, but you might want to go a little lighter on that for this meeting, and spend a little more on the project. {nid 1W6P} *** Will modify based on call today {nid 1W6Q} |
Changed: 35c35
|
== Attendees {nid 1W6R} == |
|
== Attendees {nid 1W6R} == |
Changed: 37,41c37,41
|
* Actual Attendees: {nid 1W6S} ** DeborahMacPherson {nid 1W6T} ** MichelleRaymond {nid 1W6U} ** BobSmith {nid 1W6V} ** RexBrooks {nid 1W6W} |
|
* Actual Attendees: {nid 1W6S} ** DeborahMacPherson {nid 1W6T} ** MichelleRaymond {nid 1W6U} ** BobSmith {nid 1W6V} ** RexBrooks {nid 1W6W} |
Changed: 44c44
|
** (add names here) {nid 1W6Y} |
|
** (add names here) {nid 1W6Y} |
Changed: 46c46
|
== Conference Call Notes {nid 1W6Z} == |
|
== Conference Call Notes {nid 1W6Z} == |
Changed: 48,51c48,51
|
* Need for Ontologist Advisory Group {nid 1W70} ** Requires a couple of hours of commitment a few times through out the project {nid 1W71} ** Need Ontology Management focus more than an Ontology Engineer {nid 1W72} ** Deborah to add slide on Advisory Team Roles {nid 1W73} |
|
* Need for Ontologist Advisory Group {nid 1W70} ** Requires a couple of hours of commitment a few times through out the project {nid 1W71} ** Need Ontology Management focus more than an Ontology Engineer {nid 1W72} ** Deborah to add slide on Advisory Team Roles {nid 1W73} |
Changed: 59c59
|
* Policy, implementation, and adoption {nid 1W74} |
|
* Policy, implementation, and adoption {nid 1W74} |
Changed: 61,65c61,65
|
* Business Standards and Policy Funding {nid 1W75} ** How do you take knowledge from multiple sources and bring them together to make a sense of it in context of a problem to solve? {nid 1W76} ** Example: How do we redefine city and human life-styles? {nid 1W77} ** Data available - transportation statistics and plans, city design practices, population, ... {nid 1W78} ** Method used - BIMStorm example {nid 1W79} |
|
* Business Standards and Policy Funding {nid 1W75} ** How do you take knowledge from multiple sources and bring them together to make a sense of it in context of a problem to solve? {nid 1W76} ** Example: How do we redefine city and human life-styles? {nid 1W77} ** Data available - transportation statistics and plans, city design practices, population, ... {nid 1W78} ** Method used - BIMStorm example {nid 1W79} |
Changed: 67,72c67,72
|
* Roadmaps and Framework Coordination {nid 1W7A} ** Building Standards typically {nid 1W7B} ** Industry and Public Infrastructure Collaboration {nid 1W7C} ** Policy bodies {nid 1W7D} ** Need: Get our Framework coordinated with the {nid 1W7E} ** Example - Environmental 2030 {nid 1W7F} |
|
* Roadmaps and Framework Coordination {nid 1W7A} ** Building Standards typically {nid 1W7B} ** Industry and Public Infrastructure Collaboration {nid 1W7C} ** Policy bodies {nid 1W7D} ** Need: Get our Framework coordinated with the {nid 1W7E} ** Example - Environmental 2030 {nid 1W7F} |
Changed: 74c74
|
=== Additional Prep {nid 1W7G} === |
|
=== Additional Prep {nid 1W7G} === |
Changed: 76,81c76,81
|
* Objective to get Ontologist Support {nid 1W7H} * Be ready with materials/information on: {nid 1W7I} ** Funding Opportunities within sight. {nid 1W7J} ** Business Cases {nid 1W7K} ** 'Roadmaps' {nid 1W7L} ** 'Value Statements of achievement' {nid 1W7M} |
|
* Objective to get Ontologist Support {nid 1W7H} * Be ready with materials/information on: {nid 1W7I} ** Funding Opportunities within sight. {nid 1W7J} ** Business Cases {nid 1W7K} ** 'Roadmaps' {nid 1W7L} ** 'Value Statements of achievement' {nid 1W7M} |
Changed: 84,85c84,85
|
* Deborah and Michelle to practice presentation tomorrow at 12 noon Eastern time. {nid 1W7O} * Slides to Steve {nid 1W7P} |
|
* Deborah and Michelle to practice presentation tomorrow at 12 noon Eastern time. {nid 1W7O} * Slides to Steve {nid 1W7P} |